The washroom refurbishment also involved a full strip-out, with any signs of damp addressed and remedied. The walls were prepped and clad in white hygienic, wipe-clean panelling to enhance cleanliness and ease of maintenance.
New toilet cubicles with a wood-effect finish were installed, alongside upgraded sanitary ware. The design team specified modern Corian trough sinks paired with hands-free stainless steel taps and integrated hand dryers, offering a clean, minimalist aesthetic. Large mirrors were installed above each sink to improve functionality and visual appeal.
The flooring was replaced with safety vinyl and included cap-and-cove edging for a hygienic, seamless finish.
Refurbishment Works Throughout
Across all areas, a new ceiling grid and tiles were installed, along with electrical rewiring and partial plumbing upgrades. New energy-efficient LED lighting was added, as well as additional fire alarm system detectors to ensure full compliance was met.
Communal corridors were refreshed with new vinyl flooring and a fresh coat of paint, aligning them visually with the newly refurbished breakout and washroom areas.