Following the completion of the concrete floor, the main office required decoration to the walls involving a fresh white on the ceilings and walls, with a terracotta paint as a feature colour at a set datum height applied to the columns.
Additional shelves and cupboards were fitted between existing riser cupboards as well as the client’s existing data cupboard being repositioned at a lower height. This meant the existing data cables needed extending along with additional new ones being intergrated.
The client requested to change the entrance doorset which our team provided and installed. The aluminium fire rated doorset was fitted with a Paxton 10 entry system which can be operated from the reception desk and via employees’ mobile phones for simple entry to the workplace.