Incorporating the brand colours of East Kent College, the walls in the studios were re-decorated including a corporate colour feature wall painted in teal blue which worked in contrast with the salon flooring – Polysafe Standard, Twilight and Silver Oak.
New suspended ceilings were installed throughout the 1st floor along with new data cabling, electrics, trunking, skirting, flat panel LED lighting and new touch screen interactive “Smartboards”.
The existing ventilation system was adapted to suit the new layout with new radiators were also installed and existing radiators reconfigured.
New doors and Ironmongery were installed to every room on this floor, the existing access security system had 1 set of double doors added to it and fully serviced.
A salon reception area was created outside both hair and beauty classrooms with new furniture, including a dark oak reception desk.
Display furniture – designed and built – was installed to showcase the latest hair products- like business does in the real world!
The existing store cupboard was transformed t provide a new Kitchen area. 2 new washing machines were supplied and installed – a donation to the project from Rap interiors.
To finish off this trendy student salon a new BOSE sound system was installed and designed to be dual -controlled from one central point and individually from each salon.
All works were carried out whilst the college was in operation by staff, students and clients.