Grain Power Station

Grain Power Station, Isle Of Grain

The industrial fit out at the Isle of Grain Power Station contract was won by Rap Interiors working with a main contractor.

The Project Brief

Rap Interiors encased steel columns with specialist fire rated material working at high levels. During the stages of construction cover plates were installed to floor troughs, block work was installed to divide office areas from the main equipment area. The flooring received specialist paint finish providing dust free area protection.

The whole site was under control of Areve and Rap Interiors’ own labour were under their own strict Health & Safety regulations, incorporating toolbox talks and provision of PPE.

Grain Power Station Refurbishment

Rap Interiors offers you various products which can all combine to achieve the best results. You can take advantage of all or just one of these products dependent on the project requirement. Contact us if you require further information on our comprehensive range of products.

The fit out at the Isle of Grain Power Station contract was won by Rap Interiors working with a main contractor. The full works involved installation of control units, vast electrical works along with large electric generators in the GIS area.

The Project Brief

Rap interiors encased steel columns with specialist fire rated material working at high levels. During the stages of construction cover plates were installed to floor troughs, block work was installed to divide office areas from the main equipment area. The flooring received specialist paint finish providing dust free area protection.

The whole site was under control of Areve and Rap Interiors’ own labour were under their own strict Health & Safety regulations, incorporating toolbox talks and provision of PPE.